What are the steps to build a custom home, from land to move-in?
Building a custom home takes about ten steps: set a budget, find and check land, meet your builder at the lot, design the home, get a detailed estimate and sign, line up financing, get approvals and permits, do site work and the foundation, frame and finish the house, then do a final walkthrough and move in. Construction alone usually takes 6 to 18 months.
What are the steps?
- Set your budget and must-haves. Decide what you can spend without the land, and list what the house has to have.
- Find and check the land. Check water, septic, county lot rules, the flood map, access and deed restrictions before your option period ends.
- Meet your builder at the lot. Walk the land together. Talk about where the house sits, site work and how the build would run.
- Design the home. Draw the plan with the builder’s design team or your architect, pricing it as you go.
- Get a detailed estimate and sign. Review line items and allowances, choose fixed price or cost plus, and sign a written contract.
- Line up financing. Close on a construction loan if you are using one. Ask about the construction period and draws.
- Get approvals and permits. Community design review, then septic, well registration, floodplain and building permits as they apply.
- Site work and foundation. Clear, build the driveway, drill the well, install septic, excavate rock and pour the foundation.
- Framing, systems and selections. Frame the house, rough in plumbing, electrical and HVAC, and finalize selections with your designer.
- Finishes, final walkthrough and move-in. Install finishes, walk the house together, close out the punch list and start your warranty.
Which steps take the longest?
Design and construction. Design depends on how quickly you make decisions. Construction usually takes 6 to 18 months for the homes we build, depending on size, finishes and site work. Approvals can add weeks, especially septic and design review.
Ready for step 3?
Meet Steven at your lot, or at a few lots you’re considering, and talk through the rest of the steps.
Ask about your landWhat’s different about the Hill Country?
Steps 2 and 8 carry more weight here than in a city subdivision. Raw land may need a well, an aerobic septic system, a long driveway and rock excavation before the foundation goes in. County rules matter too: Gillespie County requires 6 acres for new lots on a private well, and Kerr County now permits every new septic system.
How do you stay informed during the build?
Ask your builder before step 5. At Butcher Behrens, the owners run every build and meet every Monday afternoon to review every active project. You get a weekly email from our project software and group texts for quick decisions. I explain this in Episode 1 of Texas Hill Country Insider.
The main factor in custom home building is trust. We want to trust you as a client and we want the client to trust us as the builder.Steven Butcher, Texas Hill Country Insider, Episode 1
Related questions
What is the first step to building a custom home?
Set a budget and a list of must-haves, then find and check land, ideally with your builder.
Should I design the house before buying land?
Usually not. The lot’s views, slope, septic and well placement shape the design.
When do I sign the construction contract?
After the design is far enough along to price in detail, and before permits and construction.
How long from first meeting to move-in?
Construction is usually 6 to 18 months, plus the time it takes to design, price and permit the house.
More from the Custom Home Guide
Sources
- Steven Butcher on the building process, Texas Hill Country Insider Ep. 1: butcherbehrens.com/local-guide/custom-home-building-process-steven-butcher
- Gillespie County Engineer: gillespiecounty.gov/1198/Engineer
- Kerr County Environmental Health, OSSF: kerrcountytx.gov/kerr-county-all-departments/environmental-health-department/environmental-health-department-ossf
Last reviewed November 2026 by Steven Butcher, co-owner of Butcher Behrens Signature Homes. Rules, fees and costs change, so confirm current requirements with the county, district or lender before you buy or build. This guide is general information, not legal, tax or financial advice.
About the author
Steven Butcher co-owns Butcher Behrens Signature Homes with Hunter Behrens. He grew up in Riesel, Texas, a farm town where he graduated with 33 kids, and started out installing sprinkler systems around Dallas and Fort Worth. He moved into building as a superintendent for a luxury builder in San Antonio, where he learned the trade from the subcontractors who, in his words, saved him.
Steven and Hunter have 35 years of combined building experience, and Butcher Behrens has built 40 homes in the last 8 years around Kerrville and Fredericksburg, including homes in Boot Ranch, Vineyard Ridge, Frieden and Comanche Trace. Steven also co-hosts Texas Hill Country Insider, a podcast about living and working in the Hill Country.
Tell us about your build
Answer seven quick questions about your land, timeline and budget, and one of the owners will reach out to talk through your plans. There’s no obligation. Rather talk now? Call 210-636-5387.
What happens next
- Tell us where you are in the process.
- Steven or Hunter reaches out to learn more.
- If it’s a fit, we meet at your land or a lot you’re considering.
See if we’re a fit for your home